Final Task Planning: Other Info

Schedule  

2/14/24: On this day, all the at home filming will take place. This is where the first four scenes will take place. The easy stuff that can be done in one day. 

2/17/24 - 2/18/24: On these two days this is where the actual outside will take place. So, we will have to wait for it to become dark because we want that eerie nighttime feeling. The first day is when hopefully all the filming will be done. The scenes will be 5-30. We might be able to finish them all so I gave us an extra day to do the rest.  

2/24/24 - 3/2/24: Through these days the plan is to finish all the editing that needs to be done. Gave the most time on this because it is a long video that involves a lot of editing.  

Location 

We will be filming in two main locations, the first one will be my own house and the second one at Veteran's Park. The other sub locations will be sidewalks around the main two locations.  

    Veterans Park                                                                     Main House 



Participates  

Actors 

  • Camila Giraldo –Main character 1 (Duo) 

  • Sophia Villeda Merayo –Main character 2 (Duo) 

  • Marissa Moreno – Friend that pops up 

Filming 

  • Lizbeth Perez 

  • Sophia Villeda Merayo 

Editing 

  • Lizbeth Perez 

Directing 

  • Sophia Villeda Merayo 

 

Health and Safety 

 

To ensure our safety while filming all our scenes, an adult guardian will be present. We will have access to a phone with 911 and a medical kit. Especially the scenes that involve us outside at night by streets, sidewalks and park. If it is decided that we will use a weapon, it will be a fake one bought from the store.  

Comments

Popular Posts